If you have been following the data center industry in Southeast Asia, you already know Indonesia is ground zero for growth. The Indonesia Data Center Market was valued at USD 2.82 billion in 2025 and is projected to hit USD 6.09 billion by 2031, growing at a CAGR of 13.71**[reference:0]. That means a massive wave of new cooling towers is coming, and with them, huge demand for high-quality cooling tower fill. But here is what I am hearing from hyperscale operators on the ground: they are not just buying any fill. They want High-Efficiency Cooling Tower Media that delivers low PUE and handles Jakarta's challenging air quality. Let me walk you through what is really happening in this market.

Indonesia's data center boom is being driven by a perfect storm of factors: rapidly growing cloud adoption, government digitalization initiatives, and the rise of AI workloads. The Southeast Asia data center construction market is expected to attract cumulative investment of over $86 billion between 2026 and 2031, positioning the region as an AI-ready hub[reference:1]. But Indonesia presents unique challenges that many foreign operators underestimate.
First, air quality. Jakarta and other major cities have high levels of particulate matter, especially during dry season. That dust gets pulled into cooling towers and can quickly foul standard film fill. I have seen new data centers in Jakarta experience fill clogging within six months of operation because they did not account for local conditions. The solution is proper Air Inlet Louvers and Air Intake Screens, combined with fill media that has larger flutes to resist clogging.
A recent Jakarta Post investigation highlighted a growing concern: older data centers in Indonesia use chilled water and cooling towers, leading to high water consumption[reference:2]. This has drawn attention from local water authorities, and some new hyperscale facilities are beginning to adopt air-cooled chillers with economizers to reduce water reliance. But here is the reality: for the majority of data centers in tropical Indonesia, water-cooled systems with cooling towers remain the most energy-efficient option. The key is to minimize water loss through better components.
That is where high-efficiency Drift Eliminator comes in. The 2026 standard for drift eliminators reduces aerosol emissions to less than 0.0005** of circulating water flow[reference:3]. That is a game-changer for water-stressed regions like Jakarta. Pair that with a good Water Collector to recover splash-out, and you can dramatically cut makeup water requirements. I have seen facilities cut water consumption by 30-40** just by upgrading these components.
I have been consulting with several hyperscale operators planning new facilities in the greater Jakarta area and Batam. Here is what their cooling tower specifications look like in 2026:
One operator told me they are budgeting for fill replacement every three years instead of the typical five-year cycle, because they expect higher fouling rates. That is smart planning, but it also means they need a reliable supply chain. If you are a plant manager in Indonesia, you should be thinking the same way.
AI workloads are different from traditional enterprise applications. They demand higher rack densities and generate more heat. Some new facilities are being built with rack densities exceeding 30 kW per rack, compared to the traditional 5-10 kW. That heat has to go somewhere, and cooling towers are still the most efficient way to reject it at scale.
But here is the catch: higher heat loads mean your cooling tower fill has to handle higher water temperatures. Standard PVC starts to degrade above 50°C. For AI data centers, I recommend using polypropylene fill or high-temperature PVC blends that can handle up to 65°C. Also, pay attention to your Film Fill Cooling Tower design – higher heat loads require more surface area, but you cannot sacrifice clog resistance. It is a balancing act.
I worked on a retrofit project for an existing colocation facility in Jakarta last year. The cooling towers had 8-year-old film fill that was heavily fouled with dust and biological growth. Approach temperature had drifted from a design 3°C to over 6°C. The facility was struggling to maintain server inlet temperatures during peak hours.
We replaced the fill with new 25mm flute PVC film fill, installed new Air Inlet Grilles with fine mesh screens, and upgraded the drift eliminators. The results were dramatic: approach temperature dropped to 3.2°C, fan energy decreased by 12**, and the facility was able to raise chilled water setpoint by 1.5°C, saving an estimated $80,000 per year in chiller energy. The fill paid for itself in eight months.
If you are operating cooling towers in Indonesia, here is what I recommend based on field experience:
One more thing: do not forget about your Demister. In high-humidity environments, demister performance is critical to preventing visible plumes that attract unwanted attention.
The Indonesia data center boom is just getting started. With over $6 billion in projected market value by 2031, the demand for cooling tower components will only increase[reference:4]. But the facilities that succeed will be those that plan for local conditions from day one. Do not just copy specifications from a Singapore or Tokyo data center. Jakarta is different, and your cooling tower fill strategy should reflect that.
We have been supplying cooling tower fill to Indonesian data centers for years and understand the unique challenges of the market. Reach out if you want to discuss your specific application.
We specialize in high-durability cooling tower fill for Indonesia's unique conditions. Our products are designed to resist dust fouling and handle high humidity. Free consultation and site assessment available.
Contact us today to discuss your data center cooling tower requirements.
Contact Us Here →We are professional cooling tower fills manufacturer, which can supply wide ranges of cooling tower fills with PVC, PP or CPVC materials.
The brake oil pipes we provide have multiple monitoring certifications and complete compliance documents to help your business smoothly enter the global market.
Fully automated production line, supporting individual customization. Combined with just-in-time logistics solutions, ensuring stable inventory.
A professional foreign trade technical team provides rapid response and is a trustworthy partner, offering everything from technical Q&A to market insights.
The cooling tower fill from this company has performed reliably in our systems. We appreciate the consistent quality and noticeable efficiency improvement.
CEO & Founder
As a CEO, I value partners who deliver on their promises. Their cooling tower fill is a solid product that contributes to stable operations.
CEO & Founder
We are satisfied with the performance of this cooling tower fill. It has integrated well into our existing setup with good results.
Manager
This company provides quality cooling tower fill that meets our operational needs. It's a dependable component in our infrastructure.
CEO & Founder
Instant Chat Support
+8615303180686
packingesale@gmail.com
Get the latest information
Scan the code to follow
Return to the top of the page